SJVN has commissioned 5.6 MW Solar Plant at Charanka Solar Park, Gujarat on 31.03.2017. The project has been conceived and developed under REC Mechanism. The PPA for brown power has been signed with GUVNL for a period of 25 years w.e.f. 31.03.2017. The green component of power (i.e. RECs) are being traded at power exchange.
Village | Charanka |
Tehsil | Santalpur |
District | Patan |
State | Gujarat |
Project capacity | 5.6 MW |
Land Available | 25.95 Acres |
Technology | Multi Crystalline Silicon |
CUF | 19% |
Performance Ratio | 0.78 |
Evacuation | 66 kV |
Project Useful Life | 25 Years |
The total cost of project is Rs 35 Crore (Approved). The project was funded from the internal resources.