Charanka Solar Power Station

SJVN has commissioned 5.6 MW Solar Plant at Charanka Solar Park, Gujarat on 31.03.2017. The project has been conceived and developed under REC Mechanism. The PPA for brown power has been signed with GUVNL for a period of 25 years w.e.f. 31.03.2017. The green component of power (i.e. RECs) are being traded at power exchange.

 

Village

Charanka

Tehsil

Santalpur

District

Patan

State

Gujarat

Project capacity

5.6 MW

Land Available

25.95 Acres

Technology

Multi Crystalline Silicon

CUF

19%

Performance Ratio

0.78

Evacuation

66 kV

Project Useful Life

25 Years

The total cost of project is Rs 35 Crore (Approved). The project was funded from the internal resources.