Ongoing Consultancy Assignment Details
| Sr No. | Name of Agency seeking consultancy from SJVN Limited | Description | Year |
|---|---|---|---|
| 1 | SAPDC, Nepal | Providing consultancy for execution of Arun-3 HEP (900MW), Nepal | 2016-2021 |
Completed Consultancy Projects
| Sr No. | Name of Agency seeking consultancy from SJVN Limited | Description | Year |
|---|---|---|---|
| 1 | CEA, Ministry of power | Preparation of Pre-Feasibility Reports(PFR) for Khab-I & Khab-II HEP on river Satluj Basin | 2003 |
| 2 | M/s Bobba Power Projects(P) Limited in Karnataka | To examine Techno Economic viability of Hydel Scheme Namely Mulibetu (10.5 MW)-located in Karnataka | 2003 |
| 3 | Konkan Railway Corporation Limited (KRCL) | Geo-technical and Design engineering for Construction of 90 km section of single broad gauge railway line between Katra—Baramula rail project in J&K | 2006 |
| 4 | Himachal Pradesh Road and Infrastructure Development Corporation (HPRIDC) | Preparation of Pre-feasibility Study Reports for Tissa-Killar and Chamunda-Holi Highway Traffic tunnels | 2012 |
| 5 | Kholongchu Hydro Energy Limited” (JV of SJVN and DGPC in ratio of 50:50) | Preparation of Detailed Project report of Kholongchu HEP (600MW), Bhutan | 2012 |
| 6 | Royal Government of Bhutan | Preparation of Detailed Project Report of Wanghcu HEP (570 MW) Bhutan. | 2014 |
| 7 | M/s Teesta Urja Limited, Sikkim, Teesta Stage-III HEP (1200 MW) | Project Management Consultancy (PMC) Services. | 2019 |
