75 MW Parasan Solar Power Station was allotted by Uttar Pradesh New and Renewable Energy Agency (UPNEDA) in Village Parasan, Tehsil Kalpi, District Jalaun (U.P.) on 17.05.2021. PPA was signed on 16.06.2021 with UPPCL for a period of 25 years. Plant was commissioned on 22.10.2022 and COD was achieved on 22.11.2022.
