SJVN through Open Competitive Bidding conducted by Rewa Ultra Mega Solar Ltd. (RUMSL) bagged 90 MW Floating Solar Project at Indira Dam, Omkareshwar, Madhya Pradesh. PPA signed with MPPMCL for a period of 25 years. The project was commissioned on 08.08.2024 and COD was 30.10.2024.
